Project: Engineering on the National Energy Efficiency Program in the Municipality of Sevlievo for residential building “Mitko Palauzov”, bl. 1 – building with total built-up area – 9 246,54 m2

Client: Sevlievo Municipality

Period of implementation: from 16.06.2016 to 11.11.2016

Activities:

  • Preparation of an investment project in the Phase “Detailed design” by parts:
    •  Architecture Constructions, Electricity, Water Supply and Sewerage, Energy Efficiency, Fire Safety, Fire Safety and Protection, Waste Water Treatment and Waste Management, and Project-Documentation Documentation
  • Exercising authorship supervision during the implementation of the accepted investment project
  • Laying of an integrated thermal insulation system for additional thermal insulation of external walls – 4 138m²
  • Laying of an integrated thermal insulation system for additional thermal insulation of flat roofs – 1 096 m²
  • Laying of an integrated thermal insulation system for additional thermal insulation of floors of heated parts of the building – 4 138m²
  • Dismantling of existing waterproofing and laying of a new waterproofing system on flat roofs – 1 177,30m²
  • Sheathing with sheet iron, eaves, visors and balcony railings according to arch. detail – 1 108m²
  • Construction of a metal structure for the structural strengthening of balcony railings – 1970,70 kg.
  • Rehabilitation joints between façade panels – 544 m²
  • Replacement of facade window frames with new aluminum profiles with interrupted thermal or PVC profiles – five-chamber, glazed with energy-saving double glazing – 1211 m2
  • Reconstruction of walls, ceilings and painting activities in the common parts of the building – 2,944m²
  • Energy-efficient optimization of the electrical installation and lighting of the common parts of the building
  • Building a lightning protection installation of the block
  • Replacement of a horizontal plumbing and sewerage installation in the basement levels of the building

For the realization of the project, the specialists of Esco Engineering AD prepared the investment project, exercised the author's supervision of its execution, executed construction works on the G and D entrances, as well as the entire logistics related to its management.

What Dr. Ivan Ivanov, Mayor of the Municipality of Sevlievo said:
“The preparation of the investment project for all the above-mentioned parts, as well as the construction and assembly works for its realization were carried out professionally, with very good quality, in compliance with the current normative requirements, with a very good organization of the working process and within the agreed deadlines.

“SEVLIEVO MUNICIPALITY” recommends the consortium “FENIX BUILD” as well as the companies in its composition – Bild Ma Ltd and Esko Engineering AD as a good and reliable partner for performing such activities.”