Project: Consultancy services for the implementation of electrical installation related to the equipment of “Control and management system” and “Electric control” through PGR 2008 and PGR 2009 at 5 and 6 EB

Client: “Kozloduy NPP” EAD, Kozloduy

Implementation period: from 01.02.2008 to 31.10.2009

Activities:
  • Preparation of design solutions for modernizing elements of SCC
  • Preparing estimates of prepared technology maps
  • Development of installation documentation – CMD drawings
  • Supply of technological equipment, including:
  • Execution fittings
  • Regulating fittings
  • Elements and materials for pulse lines
  • Instruments by Part: I&C for Electric control Integration
  • Assessment of the compliance of the equipment delivered by the main contractor with the requirements of the project