Engineering on the NEEP in the Municipality of Sevlievo

Engineering on the NEEP in the Municipality of Sevlievo
Project: Engineering on the National Energy Efficiency Program in the Municipality of Sevlievo for residential building "Mitko Palauzov", bl. 1 - building with total built-up area - 9 246,54 m2 Client: Sevlievo Municipality Period of implementation: from 16.06.2016 to 11.11.2016 Activities: Preparation of an investment project in the Phase "Detailed design" by parts:  Architecture Constructions, Electricity, Water Supply and Sewerage, En

Consultancy services – Kozloduy NPP

Consultancy services – Kozloduy NPP
Project: Consultancy services for the implementation of electrical installation related to the equipment of “Control and management system” and “Electric control” through PGR 2008 and PGR 2009 at 5 and 6 EB Client: "Kozloduy NPP" EAD, Kozloduy Implementation period: from 01.02.2008 to 31.10.2009 Activities: Preparation of design solutions for modernizing elements of SCC Preparing estimates of prepared technology maps Development of instal

Pirin – Tex

Pirin – Tex
Project: Engineering for raising the Energy Efficiency of Industrial Installations at Pirin - Tex EOOD, Gotse Delchev Client: Pirin - Tex EOOD, Gotse Delchev Implementation period: from 30.03.2008 to 20.03.2010 Activities: Investigation of Energy Efficiency of Industrial Systems and Buildings of Pirin - Tex EOOD Preparation and coordination of a working investment project on all parts for realization of the determined energy saving measure

Substation – Kozloduy NPP

Substation – Kozloduy NPP
Project: Substation - Kozloduy NPP Client: "Kozloduy NPP" EAD, Kozloduy Implementation period: from 02.06.2004 to 11.11.2007 Activities: Replacement of 400 kV disconnectors Replacement of 110 kV and 220 kV measurement transformers Replacement of 400kV measurement transformers Replacement of measuring transformers and reconstruction of a HV power network at 220 kV "Esco Engineering" JSC, as a subcontractor, participated in engineer

Solar system in SHR “Health”

Solar system in SHR “Health”
Project: System for domestic hot water using solar collectors in Specialized Hospital for Rehabilitation "Health" Client: Specialized Hospital for Rehabilitation "Health" Implementation period: from от 30.03.2007 to 20.03.2008 Activities: Preparation and coordination of a working investment project on all parts Delivery facilities and equipment for building the system, including: Solar collectors - 70 pcs . Accumulating tank and bo

Gypsum dewatering plant – Maritsa East 2

Gypsum dewatering plant – Maritsa East 2
Project: Construction of a gypsum dewatering plant for blocks 1-6 Client: TPP Maritsa East 2, Bulgaria Period of implementation: from 05.08.2009 to 29.09.2012, Activities: Design Supply of basic and technological equipment: Vacuum filters Hydrocyclones Band conveyors Electrical equipment for transformer substations CIP and A Waste water tank Gypsum storage facility Installation of external and internal sewerag