Engineering on the NEEP in the Municipality of Sevlievo

Engineering on the NEEP in the Municipality of Sevlievo
Project: Engineering on the National Energy Efficiency Program in the Municipality of Sevlievo for residential building "Mitko Palauzov", bl. 1 - building with total built-up area - 9 246,54 m2 Client: Sevlievo Municipality Period of implementation: from 16.06.2016 to 11.11.2016 Activities: Preparation of an investment project in the Phase "Detailed design" by parts:  Architecture Constructions, Electricity, Water Supply and Sewerage, En

Consultancy services – Kozloduy NPP

Consultancy services – Kozloduy NPP
Project: Consultancy services for the implementation of electrical installation related to the equipment of “Control and management system” and “Electric control” through PGR 2008 and PGR 2009 at 5 and 6 EB Client: "Kozloduy NPP" EAD, Kozloduy Implementation period: from 01.02.2008 to 31.10.2009 Activities: Preparation of design solutions for modernizing elements of SCC Preparing estimates of prepared technology maps Development of instal

Pirin – Tex

Pirin – Tex
Project: Engineering for raising the Energy Efficiency of Industrial Installations at Pirin - Tex EOOD, Gotse Delchev Client: Pirin - Tex EOOD, Gotse Delchev Implementation period: from 30.03.2008 to 20.03.2010 Activities: Investigation of Energy Efficiency of Industrial Systems and Buildings of Pirin - Tex EOOD Preparation and coordination of a working investment project on all parts for realization of the determined energy saving measure

Substation – Kozloduy NPP

Substation – Kozloduy NPP
Project: Substation - Kozloduy NPP Client: "Kozloduy NPP" EAD, Kozloduy Implementation period: from 02.06.2004 to 11.11.2007 Activities: Replacement of 400 kV disconnectors Replacement of 110 kV and 220 kV measurement transformers Replacement of 400kV measurement transformers Replacement of measuring transformers and reconstruction of a HV power network at 220 kV "Esco Engineering" JSC, as a subcontractor, participated in engineer

Solar system in SHR “Health”

Solar system in SHR “Health”
Project: System for domestic hot water using solar collectors in Specialized Hospital for Rehabilitation "Health" Client: Specialized Hospital for Rehabilitation "Health" Implementation period: from от 30.03.2007 to 20.03.2008 Activities: Preparation and coordination of a working investment project on all parts Delivery facilities and equipment for building the system, including: Solar collectors - 70 pcs . Accumulating tank and bo

Gypsum dewatering plant – Maritsa East 2

Gypsum dewatering plant – Maritsa East 2
Project: Construction of a gypsum dewatering plant for blocks 1-6 Client: TPP Maritsa East 2, Bulgaria Period of implementation: from 05.08.2009 to 29.09.2012, Activities: Design Supply of basic and technological equipment: Vacuum filters Hydrocyclones Band conveyors Electrical equipment for transformer substations CIP and A Waste water tank Gypsum storage facility Installation of external and internal sewerag

Fourth renovated building in Montana

Fourth renovated building in Montana
Block 21 in the bc. Mladost 1 in Montana already has a new vision. Mayor Zlatko Zhivkov and the regional governor Ivaylo Petrov opened the 4th sanitary block in Montana under the National  Energy Efficiency Program. The residential building consists of 3 entrances, each of 7 floors. They have 49 families. The priests of Montana, Father Emil and Father Nicholas, performed the solemn sanctuary. The renovation of the building was done ahead of schedule...

The mayor of Sevlievo Dr. Ivanov opened the fourth renovated building

The mayor of Sevlievo Dr. Ivanov opened the fourth renovated building
The renovated residential building is a block № 1 in the residential complex "Mitko Palauzov" and was rehabilitated with funds from the National Program for Energy Efficiency of Multifamily Housing. Upon completion of the construction and assembly activities of the block, 117 households now benefit from a fully-fledged building. This is the fourth rehabilitated block in Sevlievo.. In his welcoming speech, the mayor thanked the residents of the building ...