Since March 25, 2019 you can find Esco Engineering at a new address - Sofia, "Balsha 1” str., bl 9, fl 8.
Project: Engineering on the National Energy Efficiency Program in the Municipality of Sevlievo for residential building "Mitko Palauzov", bl. 1 - building with total built-up area - 9 246,54 m2
Client: Sevlievo Municipality
Period of implementation: from 16.06.2016 to 11.11.2016
Activities:
Preparation of an investment project in the Phase "Detailed design" by parts:
Architecture Constructions, Electricity, Water Supply and Sewerage, En
Project: Consultancy services for the implementation of electrical installation related to the equipment of “Control and management system” and “Electric control” through PGR 2008 and PGR 2009 at 5 and 6 EB
Client: "Kozloduy NPP" EAD, Kozloduy
Implementation period: from 01.02.2008 to 31.10.2009
Activities:
Preparation of design solutions for modernizing elements of SCC
Preparing estimates of prepared technology maps
Development of instal
Project: Engineering for raising the Energy Efficiency of Industrial Installations at Pirin - Tex EOOD, Gotse Delchev
Client: Pirin - Tex EOOD, Gotse Delchev
Implementation period: from 30.03.2008 to 20.03.2010
Activities:
Investigation of Energy Efficiency of Industrial Systems and Buildings of Pirin - Tex EOOD
Preparation and coordination of a working investment project on all parts for realization of the determined energy saving measure
Project: Substation - Kozloduy NPP
Client: "Kozloduy NPP" EAD, Kozloduy
Implementation period: from 02.06.2004 to 11.11.2007
Activities:
Replacement of 400 kV disconnectors
Replacement of 110 kV and 220 kV measurement transformers
Replacement of 400kV measurement transformers
Replacement of measuring transformers and reconstruction of a HV power network at 220 kV
"Esco Engineering" JSC, as a subcontractor, participated in engineer
Project: System for domestic hot water using solar collectors in Specialized Hospital for Rehabilitation "Health"
Client: Specialized Hospital for Rehabilitation "Health"
Implementation period: from от 30.03.2007 to 20.03.2008
Activities:
Preparation and coordination of a working investment project on all parts
Delivery facilities and equipment for building the system, including:
Solar collectors - 70 pcs .
Accumulating tank and bo
Project: Construction of a gypsum dewatering plant for blocks 1-6
Client: TPP Maritsa East 2, Bulgaria
Period of implementation: from 05.08.2009 to 29.09.2012,
Activities:
Design
Supply of basic and technological equipment:
Vacuum filters
Hydrocyclones
Band conveyors
Electrical equipment for transformer substations
CIP and A
Waste water tank
Gypsum storage facility
Installation of external and internal sewerag
Block 21 in the bc. Mladost 1 in Montana already has a new vision. Mayor Zlatko Zhivkov and the regional governor Ivaylo Petrov opened the 4th sanitary block in Montana under the National Energy Efficiency Program.
The residential building consists of 3 entrances, each of 7 floors. They have 49 families. The priests of Montana, Father Emil and Father Nicholas, performed the
solemn sanctuary.
The renovation of the building was done ahead of schedule...
The renovated residential building is a block № 1 in the residential complex "Mitko Palauzov" and was rehabilitated with funds from the National Program for Energy Efficiency of Multifamily Housing. Upon completion of the construction and assembly activities of the block, 117 households now benefit from a fully-fledged building. This is the fourth rehabilitated block in Sevlievo..
In his welcoming speech, the mayor thanked the residents of the building ...